ANALISA PEMASANGAN 1 m² LANGIT – LANGIT PVC
Pemasangan 1m²
Langit – langit PVC
No. |
Uraian |
Kode |
Satuan |
Koefisien |
Harga Satuan |
Jumlah Harga |
A |
Tenaga |
|
|
|
|
|
|
Pekerja |
L.01 |
OH |
0.1 |
85,000.00 |
8,500.00 |
|
Tukang Kayu |
L.02 |
OH |
0.05 |
100,000.00 |
5,000.00 |
|
Kapala Tukang |
L.03 |
OH |
0.005 |
110,000.00 |
550.00 |
|
Mandor |
L.04 |
OH |
0.005 |
100,000.00 |
500.00 |
|
|
|
|
|
|
|
B |
Bahan |
|
|
|
|
|
|
Langit – langit PVC |
|
m² |
1.1 |
35,000.00 |
38,500.00 |
|
Paku Skrup |
|
kg |
0.11 |
32,500.00 |
3,575.00 |
|
|
|
|
|
|
|
C |
Jumlah |
|
|
|
|
56,625.00 |
|
|
|
|
|
|
|
Catatan : Harga diatas belum termasuk profit dan untuk pekerjaan pengecatan masuk dalam pekerjaan pengecatan.